XPCore Textile Ops
RFID Linen Tracking Platform
Sign In
Closed-Loop RFID Linen Lifecycle Control Tower • ISO 18000-6C Gen2

12-Stage Operational Linen Lifecycle • Clockwise Closed-Loop Digital Twin

FLEET MASS BALANCE: 0 pcs
IJN Hospital ↔ Astana Plant
Facility Perspective:
SLCF: 0
CLDN: 0
RRF: 0
⚖️ 4 Scales Active
📍 3.1712° N, 101.7018° E
🔄
Cross-Site Drift Monitor: Zero cross-site drift detected across facilities
0 pcs drift (0.00%)
Client Destination (Hospital • IJN) 0 pcs (0.0%) SCAN 1 • 📄 SLCF OUT Hospital Exit Soiled Outbound Dock • Gate B 0 pcs (0.0%) 🟢 SLA: Loading 32m (< 45m Target) 📡 Gate B FX9600 ZONE B • ⚖️ WEIGH 1 Ready to Pick Up (Soiled) Soiled Linen Holding Room • Chutes 0 pcs (0.0%) 🟡 SLA: Dwell 18.2h (24h Max Limit) 🔫 Mobile Sled ZONE A • CLR / WARDS In Circulation (Wards) Ready Beds, OT, ICUs, Patient Rooms 0 pcs (0.0%) 🟢 SLA: 92.4% PAR (Bed Turn < 24h) 🔫 TC26 Sled SCAN 6 • ⚖️ W4 • 📄 CLDN IN Hospital In (Receive) Gate H Central Linen Store Intake 0 pcs (0.0%) 🟢 SLA: Check-in 28m (< 1h Buffer) 📡 Gate H FX9600 📋 TRANSPORT FORM: SLCF (Soiled Linen Collection Form) Soiled Transit COMPUTED: Plant Intake − Hospital Exit 0 pcs (0.0%) 🟢 SLA: Transit 1.1h < 2.0h (Custody Logged) TOTAL FLEET 0 Closed-Loop Mass Balance 100% Reconciliation Equilibrium Hospital (0.0%) • Plant (0.0%) • Road (0.0%) • Click to Inspect Global Mass Balance • Industrial Wash Plant (Astana) 0 pcs (0.0%) SCAN 2 • ⚖️ WEIGH 2 Receive for Wash Gate D Soiled Intake Dock • Weigh Bridge 0 pcs (0.0%) 🔴 SLA ALERT: Shortfall 5.2% (> 5% KPI 2) 📡 Gate D Scale CLEAN / SOILED BARRIER (EN 14065) CBW Tunnel Wash Hall 0 pcs (0.0%) 🟢 Wash < 75m (62m) SCAN 3 • QC 1: E1 REWASH Iron & Pack Finishing Hall 0 pcs (0.0%) 🟢 Rewash 2.1% (< 5%) SCAN 5 • QC 2: E2 REJECT Reject Bay Tag Harvest • Spoilt / Condemn 0 pcs (Leaves) 🟢 Warranty ≥ 200w Clean Staging Finished Racks 0 pcs (0.0%) 🟢 Dwell 3.8h (< 6h) SCAN 4 • ⚖️ WEIGH 3 Loaded to Transport Gate F Clean Outbound Dock Portal 0 pcs (0.0%) 📄 CLDN: Clean Stream 📄 RRF: Reject Stream 📋 DUAL FORMS: CLDN (Clean Stream) • RRF (Reject Return Note) Clean Transit COMPUTED: Hospital In − Plant Out 0 pcs (0.0%) 🟢 SLA: Arrive 09:15 AM < 10:00 AM (KPI 1)

Dwell Time per Zone (Hours)

Wash Plant
0.0
Transit
0.0
Hospital
0.0
0 5 10 15 20 25

Unit Turnaround Time vs 24h SLA

0%
24h SLA
Average Turnaround: -- Hours (≤ 24h Contract Target)

Daily Linen Circulation Balance

24h Shift Outbound Dispatched vs Inbound Received
0 - 0
Outbound Dispatched (24h) Inbound Received (24h)
Δ 0 Units (0.00% Variance • 100.00% Reconciliation)
📦 Live Dock Staging: Outbound 0 pcs • Inbound 0 pcs
⚡ Closed-Loop Fleet Balance: 0 pcs (Equilibrium)